LOADING…
LOADING…
Fervo Energy · Beaver County, UT · UtahDEVELOPER HEALTHHEALTHY
Eight 50 MW GeoBlocks; guided all-in cost about $5,500/kW (target $3,000/kW long term).
Power
400 MW
Geothermal · Scaling
Storage
—
energy capacity
Online
2028
approximate target
Capital committed
—
closed or awarded
Capital pending
—
conditional or under review
How it works
Where rock is hot but dry, drill down and then sideways, crack the rock open between two wells, pump water down one and bring it up hot through the other. Borrowed from oil-and-gas drilling, so it can work in many more places.
OPEN IN 3D →Others on this approach
Sources: thinkgeoenergy.com · fervoenergy.com · renewableenergyworld.com
STEP 2/5 · SECURE Next-gen geothermal gets bankable offtakeLong-term contracts let developers raise project debt.
Critical inputs
Policy that applies