Fervo Energy · Beaver County, UT · UtahDEVELOPER HEALTHHEALTHY
First utility-scale enhanced geothermal plant: a 100 MW phase of three 33 MW GeoBlocks. Capacity here is what is operating: GeoBlock 1 (33 MW) declared commercial operation Sept 30, 2026; GeoBlocks 2–3 expected by Jan 1, 2027.
Power
33 MW
Geothermal · First commercial
Storage
—
energy capacity
Online
Sep 30, 2026
actual
Capital committed
$421M
closed or awarded
Capital pending
—
conditional or under review
How it works
Where rock is hot but dry, drill down and then sideways, crack the rock open between two wells, pump water down one and bring it up hot through the other. Borrowed from oil-and-gas drilling, so it can work in many more places.
OPEN IN 3D →Others on this approach
Project debt $360MTax credit $61M
Sources: thinkgeoenergy.com · fervoenergy.com · renewableenergyworld.com
Southern California Edison; Shell Energy; California community choice aggregators
Fully contracted under PPAs; SCE takes most of the output
Shell EnergyBUYERSouthern California EdisonUTILITY BUYER