Hydrostor · Rosamond, Kern County, CA · CaliforniaDEVELOPER HEALTHHEALTHY
Advanced compressed-air storage in a purpose-built underground cavern; 8-hour discharge. CEC license Dec 2025; groundbreaking planned mid-2026.
Power
500 MW
Long-duration storage · First commercial
Storage
4 GWh
8-hour duration
Online
2030
approximate target
Capital committed
$300M
closed or awarded
Capital pending
$1.8B
conditional or under review
How it works
Spare power squeezes air into an underground cavern; a column of water keeps it at steady pressure. Releasing the air through a turbine makes power again.
OPEN IN 3D →DOE loan $1.8BEquity $300M
Sources: energy-storage.news · utilitydive.com · energy-storage.news
Central Coast Community Energy
200 MW resource-adequacy contract
Central Coast Community EnergyUTILITY BUYER
DOE Loan Programs OfficePUBLIC FUNDERGoldman Sachs Asset ManagementINVESTORCPP InvestmentsINVESTOR
STEP 2/4 · AT RISK Willow Rock's $1.76B conditional loan in limboThe project is permitted but its federal loan guarantee is still under review.