Quaise Energy · Newberry area, OR · OregonDEVELOPER HEALTHHEALTHY
Superhot geothermal using millimeter-wave drilling; at least 50 MW first phase, 250 MW second phase, goal of 1 GW. Confirmation well expected in 2026.
Power
50 MW
Geothermal · First commercial
Storage
—
energy capacity
Online
By 2030
approximate target
Capital committed
—
closed or awarded
Capital pending
$25M
conditional or under review
How it works
Where rock is hot but dry, drill down and then sideways, crack the rock open between two wells, pump water down one and bring it up hot through the other. Borrowed from oil-and-gas drilling, so it can work in many more places.
OPEN IN 3D →Others on this approach
Grant $25M
Grid connection, permits, contractors and cost not researched yet for this project.