TerraPower · Kemmerer, WY · Wyoming
Sodium-cooled fast reactor with molten-salt storage that can boost output to 500 MW for 5.5+ hours. First non-light-water commercial reactor permitted by the NRC; nuclear construction began Apr 23, 2026. About $4B all-in (2021 estimate).
Power
345 MW
Fission · First commercial
Storage
—
energy capacity
Online
Feb 2031
approximate target
Capital committed
$2.0B
closed or awarded
Capital pending
—
conditional or under review
How it works
The core sits in a pool of liquid metal or molten salt that carries heat away at normal pressure. Some designs store that heat in molten-salt tanks so the plant can boost output when the grid needs it.
OPEN IN 3D →Construction permit issued
Grant $2.0B
Sources: ans.org · datacenterknowledge.com · powermag.com · ans.org · emp.lbl.gov
Rocky Mountain Power (PacifiCorp)
PacifiCorp's Rocky Mountain Power slated to own the plant at operation; Meta separately agreed (Jan 2026) to up to eight Natrium plants
Rocky Mountain Power (PacifiCorp)UTILITY BUYER
STEP 4/6 · AT RISK HALEU is the bottleneckMost advanced designs need HALEU (5–20% enriched), with no commercial US supply at scale yet.
STEP 5/6 · AT RISK Advanced reactor timelinesFuel availability becomes a gating item for first units.
STEP 4/4 · WATCH Office relaunched as Energy Dominance FinancingLending shifts toward nuclear and utility expansions (AP1000 offers, Constellation uprates).