Controlled Thermal Resources · Imperial County, CA · CaliforniaDEVELOPER HEALTHWATCH
Up to 500 MW of geothermal power at the Salton Sea, built in stages with Baker Hughes, that also extracts battery-grade lithium from the brine. Stage 1 has a conditional use permit to begin construction.
Power
500 MW
Geothermal · First commercial
Storage
—
energy capacity
Online
—
not announced
Capital committed
—
closed or awarded
Capital pending
—
conditional or under review
How it works
Wells tap natural underground reservoirs of hot water and steam. It runs the turbine at the surface, then the cooled water goes back down a second well to keep the reservoir going.
OPEN IN 3D →No project-level financing disclosed yet.
Sources: thinkgeoenergy.com · emp.lbl.gov
Imperial Irrigation District
40 MW PPA with IID; rest aimed at data centers, possibly behind the meter