LOADING…
LOADING…
Handan, China · State-owned
Alkaline electrolyzers
Open roles
—
no public job board
Federal awards
—
none found
Last private raise
—
no Form D on file
SEC filings
—
not an SEC filer
Coming up
POLICY45V: clean hydrogen
Facilities must begin construction before Jan 1, 2028. Affects Hydrogen.
+ THESISPOLICY45Q: carbon capture
Facilities must begin construction before 2033; inflation indexing starts in 2027. Affects Hydrogen.
+ THESISPOLICY45Y / 48E: all other clean power and storage
Full credit for projects beginning construction through 2033; 75% for 2034 starts, 50% for 2035, none from 2036. Affects Hydrogen.
+ THESISPARTNERSHIPMetacon launches PERIC next-generation pressurised alkaline stacks in Europe
Swedish firm Metacon announced the European launch of partner PERIC's next-generation pressurised alkaline electrolyser stacks, to be deployed in ongoing and future commercial projects. Metacon's earlier licensing extension lets it manufacture PERIC-designed stacks in a planned European gigafactory.
hydrogeninsight.com →+ THESISPROJECTPERIC ships 7.5MW alkaline electrolyzer system to Romania
Hydrogen Insight reported that PERIC shipped a 7.5MW system to a Romanian green hydrogen project, one of the latest shipments into the EU. FuelCellsWorks also reported completed delivery of the 7.5MW alkaline equipment.
hydrogeninsight.com →+ THESISPROJECTPERIC ships first Canadian hydrogen project equipment, 1.75MW container system
SMM's weekly electrolyzer review reported that PERIC's Canadian hydrogen project equipment completed factory inspection and was shipped. The installation is 1.75MW and uses a containerized integrated hydrogen production system.
news.smm.cn →+ THESISHow it works
Electricity splits water into hydrogen and oxygen across a membrane or liquid electrolyte. Clean power in makes clean hydrogen out.
OPEN IN 3D →No public filings, raises or hiring trend to read yet.
Read from SEC 8-Ks (bankruptcy, default, delisting, restatement, impairment, restructuring), cash runway in annual reports, Form D raises and the 30-day hiring trend. A prompt to look closer, not a credit rating.
No public job board on Greenhouse, Lever or Ashby, so hiring isn't tracked for this company yet.
No federal grants, contracts or loans found on USAspending.gov under this company's US entity name.
Policy that applies
No minerals, policies or partners linked yet. Add them in the review spreadsheet.
Sources: company job boards (daily), SEC EDGAR, USAspending.gov, and the reviewed technology spreadsheets. Public records only cover US entities, so foreign companies and private firms that don't file will show gaps.
2026-09-10 · partnership
Metacon launches PERIC next-generation pressurised alkaline stacks in EuropeSwedish firm Metacon announced the European launch of partner PERIC's next-generation pressurised alkaline electrolyser stacks, to be deployed in ongoing and future commercial projects. Metacon's earlier licensing extension lets it manufacture PERIC-designed stacks in a planned European gigafactory.2026-08-19 · project
PERIC ships 7.5MW alkaline electrolyzer system to RomaniaHydrogen Insight reported that PERIC shipped a 7.5MW system to a Romanian green hydrogen project, one of the latest shipments into the EU. FuelCellsWorks also reported completed delivery of the 7.5MW alkaline equipment.2026-07-02 · project
PERIC ships first Canadian hydrogen project equipment, 1.75MW container systemSMM's weekly electrolyzer review reported that PERIC's Canadian hydrogen project equipment completed factory inspection and was shipped. The installation is 1.75MW and uses a containerized integrated hydrogen production system.Not an SEC filer, or no US entity matched. Most private and foreign companies don't file.